ASD ENGINEERING & CONSULTINGENGINEERING • INSPECTION • ENERGY
EXPERIENCE BUILT IN THE FIELD

FROM CONCEPT TO PLANT.
FORWARD WITH CONFIDENCE.

From international plant start-ups to production line investments: practical engineering in electrical systems, CAPEX and commissioning.

OG / AGCAPEXFAT / SATCOMMISSIONING
ADNAN DELİKELElectrical Engineer · Industrial Project Experience
Aerial view of the Kamlit plant from the career presentation
01 / GREENFIELDKamlit · Kazakhstan
3D foundry model from the career presentation
02 / PROJECT INTEGRATIONFoundry · 3D layout
Automotive plant equipment installation from the career presentation
03 / SITE EXECUTIONAutomotive · Equipment installation
23+YEARS OF ENGINEERING EXPERIENCE
80+ENGINEERS / CONTRACTORS COORDINATED¹
100+FAT / SAT ACTIVITIES²

Images and figures relate to Adnan Delikel’s personal experience in previous roles. ¹ GEMCO / Kamlit · ² Trakya Döküm.

OUR APPROACH

CLARITY IN ENGINEERING. CONFIDENCE IN EXECUTION.

Technical Analysis

Data-driven assessment and practical solutions.

Field-Focused Approach

Methods tailored to project, facility and operational needs.

Measurable Results

Trackable targets for performance, reliability and cost.

ASD / ENGINEERING EXPERIENCE

ENGINEERING EXPERIENCE FROM THE FIELD

Selected personal experience from Adnan Delikel’s previous roles. These projects are not corporate client references of ASD.

23+years of engineering experience
80+engineers and contractors coordinated¹
100+FAT/SAT activities²
98%equipment availability²

¹ GEMCO / Kamlit role · ² Trakya Döküm role · Source: supplied CV. Historical results do not constitute a promise of future outcomes.

EXPLORE PROJECT EXPERIENCE →
02 / SELECTED EXPERIENCE

FROM CONCEPT TO OPERATING PLANT

Selected international plant start-ups and industrial line investments.

01 / GEMCO / KAMLIT

Greenfield plant

Commissioning, supplier coordination and start-up in Kazakhstan.

80+engineers and contractors
02 / FOUNDRY · 7TH LINE

New production line

Melting, moulding, sand preparation and PCS 7 automation integration.

100 t/hsand preparation capacity
03 / FOUNDRY · 6TH LINE

Capacity investment

Line investment with Disa D270-A moulding and a 12-ton melting furnace.

150 t/hsand preparation capacity

Personal experience from Adnan Delikel’s previous roles, not projects delivered by ASD. Capacity figures describe processes documented in the career presentation.

EXPLORE PROJECT EXPERIENCE →
03 / DELIVERY PROCESS

A CLEAR PATH FROM INVESTMENT TO OPERATION

Defined engineering deliverables and traceable progress at every stage.

01

Needs & feasibility

Site review, capacity requirements and comparison of investment options.

02

Specification & procurement

Technical specifications, bid comparison matrix and supplier assessment.

03

Site & acceptance

Installation monitoring, FAT/SAT coordination, nonconformity and punch lists.

04

Commissioning & handover

Functional tests, performance verification and operational handover records.

ASD / ENGINEERING EXPERIENCE

MEASURABLE IMPROVEMENT EXPERIENCE

Results reported in the supplied CV for the Trakya Döküm role.

OEE78% → 86%
Grey: baseline 78% · Teal: result 86% · +8 percentage points
Downtime−30%

TPM · Lean · Preventive maintenance

Selected personal experience from Adnan Delikel’s previous roles. These projects are not corporate client references of ASD.

Let’s develop a technical solution for your project.CONTACT US →